Ask ten RAS suppliers how much biofilter media a farm needs and you will get ten volumes — most of them derived from the tank: “media is usually 10–20% of system volume,” or a ratio copied from the last project. Tank-based rules fail in a predictable direction, because a biofilter does not treat water volume. It treats ammonia, and in a recirculating system the ammonia load is set by one number the farmer already knows precisely: how much feed goes in each day.
Feed is the input; ammonia is the waste product of feeding. Size the media from the feed rate and the calculation has an anchor. Size it from the tank and you have a guess. This article shows the feed-rate-first calculation end to end, with the assumptions stated — because the assumptions are where honest suppliers and catalogue salesmen part company.
Step 1 — Feed rate to ammonia load
Fish excrete most of their nitrogen waste as total ammonia nitrogen (TAN). The standard planning formula used across the RAS industry:
TAN produced (kg/day) = daily feed (kg/day) × protein fraction × 0.092
Worked example — a farm feeding 100 kg/day of a 45% protein feed:
100 × 0.45 × 0.092 = 4.14 kg TAN/day
That is the load the biofilter must convert, every day, at the farm’s maximum feeding rate — not the average. Fish grow; feed rations peak before harvest. If the farm plans to reach 150 kg/day, run the calculation at 150 (which gives 6.21 kg TAN/day) and either buy that volume now or plan the top-up before the fish do.
A useful cross-check: full nitrification of 1 g of ammonia-nitrogen needs about 4.57 g of oxygen. The example load therefore implies roughly 19 kg/day of oxygen demand from nitrification alone — a number worth holding against the farm’s aeration or oxygenation capacity before anyone argues about media brands.
Step 2 — Ammonia load to media volume
Media volume = TAN load ÷ (nitrification rate per m² × surface area per m³)
Two inputs, and both need their basis stated:
- Surface area per m³ is the media figure. For HDPE carriers it should be the protected surface area — for our nine models, above 650 to above 1,600 m²/m³ depending on model.
- Nitrification rate per m² is a design assumption, not a media property. It moves with water temperature, dissolved oxygen, pH and how conservative the designer wants to be. A commonly used planning value for a well-run warm-water MBBR is around 0.5 g TAN/m²/day; cold water or a cautious designer will use less.
Worked example, continued — using a carrier with a protected area of 800 m²/m³ and the 0.5 g/m²/day planning rate:
- Capacity per m³ of media = 800 × 0.5 = 400 g TAN/day = 0.4 kg/day
- Media volume = 4.14 ÷ 0.4 = ≈ 10.4 m³
Now watch what the assumption does. At a planning rate of 0.35 g/m²/day — a designer allowing for cool water — the same farm needs about 14.8 m³. At 0.7, about 7.4 m³. The media did not change; the assumption did. This is why two quotations for the same farm can differ by a factor of two with both suppliers using “correct” arithmetic. When you compare RAS media quotations, compare the assumed rate first and the price second. A supplier who will not state the rate has not sized your biofilter — they have priced a pile of plastic.
A warning about sponge media numbers — including ours
Sponge biofilm media is quoted on a different basis. Our NovusPore sponge, for example, is specified at above 5,000 m²/m³ — measured by BET, which counts the internal pore surface of the foam. That is a real measurement, but it is not the same quantity as a carrier’s protected geometric area, and you cannot divide a TAN load by a BET figure and a geometric-area rate and get a meaningful volume. Suppliers who invite you to do exactly that are comparing two different rulers.
For sponge media, the honest route is a loading figure for the specific duty — RAS duty differs from municipal duty — supplied by the manufacturer for that application, checked against the same feed-rate load from Step 1. Ask for the basis in writing; if the answer is only the BET number repeated louder, treat the sizing as unverified. We size sponge volumes for RAS projects from the feed data case by case, and we state the loading basis on the quotation.
What changes the answer — the short list
- Peak vs average feed. Size for peak; growth curves are not flat.
- Protein content. On the same tonnage, a 45% protein feed loads the filter about 18% harder than a 38% feed.
- Temperature. Nitrification slows as water cools; a farm with cold winters needs the conservative rate (see our companion piece on winter MBBR design).
- Safety factor. Farms that cannot tolerate an ammonia excursion — hatcheries, high-value species — should say so; the factor belongs in the rate assumption, openly.
Send the feed sheet, get a sized quotation
To size media for a RAS project we need: maximum daily feed (kg/day) and feed protein %, species and target water temperature range, existing biofilter tank dimensions if this is a retrofit, and whether the media is HDPE carrier or sponge. With that, the quotation states the TAN load, the assumed nitrification rate, the surface-area basis and the resulting volume — every number on the page traceable to an assumption you can challenge. That is what a sizing calculation is for.
FAQ
Why not size by tank volume percentage?
Because two farms with identical tanks can feed very different amounts. The tank holds the media; the feed creates the load. Percentages of volume ignore the only number that produces ammonia.
Is 0.5 g TAN/m²/day the right rate for my farm?
It is a planning value, not a constant of nature. Temperature, DO, pH and your tolerance for risk move it. Any quotation we issue states the rate used, so your engineer can substitute their own and re-run the volume in one line of arithmetic.
Can I mix sponge and HDPE carriers in one biofilter?
It is done, but the two are sized on different bases (see the BET warning above), so the split should come from a calculation for each — not from filling the remaining space with whichever is cheaper.
My supplier quoted half your volume. Who is wrong?
Possibly neither — check the assumed nitrification rate and the surface-area basis on both quotations first. If the other quotation states neither, it is not a sizing; it is a guess with a price attached.